|
After
spending all day clearing a big enough area to start the
build, I am trying to create a well in order that I can take a
mould directly from the inside of the wooden plug, which means
the inside of the plug need to measure to outside of the
finished hovercraft, As
you can see once I had a level surface big enough the job was
to cut out the shapes for the hovercraft base and construct a
wood outline ready for fibreglassing.
|
|